- P.O. Box 1042 Ballston Lake, N.Y. 12019-1042
- Mon–Fri 9:00 AM – 6:00 PM EST
- 518-320-2501

Mechanical contractors lose time and money when controls submittals are incomplete, unclear, or inconsistent with the Sequence of Operations (SOO), mechanical plans, or equipment schedules. Advantage Engineering Technologies provides expert third-party HVAC controls submittal review and redline correction to ensure your controls package is accurate, coordinated, and ready for GC approval — the first time. We serve mechanical and controls contractors across the U.S. and Canada.
We eliminate the guesswork, catch issues early, and protect your project schedule.
This service is designed for mechanical contractors, controls contractors, and design‑build firms who need accurate, coordinated controls submittals that pass GC and commissioning review the first time.
We Fix the Problems That Cause Delays
Controls submittals are often:
We identify these issues before they become costly field changes.
Comprehensive Review of All Controls Documentation
We review and redline:

We provide clear, contractor-friendly redlines identifying:
We verify the submittal matches the SOO:
We cross-check against:
You receive a clean, professional PDF report including:
This is the document you hand directly to the GC or BAS vendor.
You Receive:
These are the exact issues that cause GC rejections, commissioning delays, and field rework.
Scope of This Service
This review is a third-party quality-control service performed on behalf of the contractor. It is intended to catch errors and coordination gaps before formal submission. It does not replace, supersede, or substitute for the Engineer of Record’s official submittal review and approval process.
Pricing Guidance
| Project Type | Typical Fee Range |
| Small RTU / Split System | $500 – $900 |
| Medium AHU / VAV System | $900 – $1,800 |
| Large AHU / DOAS / Hydronic System | $1,800 – $2,500 |
| Full Building Controls Package | $2,500 – $4,500 |
Fast-track review available for urgent GC deadlines. Final pricing depends on system complexity and submittal completeness.
Industries Served
We Understand Contractors
We’ve spent decades supporting mechanical and controls contractors. We know:
We Speak Controls, Mechanical & Commissioning
Most engineers only understand one side. We understand all three — and that’s why our reviews catch what others miss.
Fast Turnaround
Most reviews completed in 2–5 business days.
High ROI
A single missed point or logic error can cost thousands in field rework. Our review prevents that.
Already have your system installed and want a performance review instead of a submittal review? See our HVAC Controls Review & Optimization service:
How long does a controls submittal review take?
Most reviews are completed in 2–5 business days. Fast-track turnaround is available for urgent GC deadlines.
Do you review BAS vendor-specific submittals?
Yes. We review submittals from any BAS manufacturer or controls contractor and cross-check them against your project’s Sequence of Operations and mechanical documents.
Will this review replace the Engineer of Record’s submittal approval?
No. This is a third-party, contractor-side quality-control review intended to catch errors before formal submission. It does not replace the Engineer of Record’s official review and approval process.
What do I need to send to get started?
Send your controls submittal package (points list, control diagrams, panel layouts) along with the project’s Sequence of Operations and mechanical schedules, if available.
Get Your Controls Submittal Reviewed Before the GC Redlines It
Avoid delays, prevent rework, and get your controls package approved the first time.
Contact us today to schedule your HVAC Controls Submittal Review.
Or simply send your submittal package and we’ll begin the review.